The Training Complex Building in the West Campus of Guangxi Vocational and Technical University of Agriculture required the construction of a supporting substation and power distribution system. The core project requirements were:
Equipment Configuration:
High-Voltage System: 4 units of KYN28-12 Armored Withdrawable Switchgear
Low-Voltage System: 17 units of SWGCS Withdrawable Switchgear
PV Integration: 1 unit of AP01 PV Grid-Connection Cabinet
PV Integration: 22 units of Complete High and Low-Voltage Enclosures
Environmental Conditions: Daily average humidity in the Nanning area ≤ 95%
Functional Objective: To handle diverse electrical loads including teaching/training equipment and PV grid integration.
Multi-Scenario Power Supply Compatibility: Needed to simultaneously accommodate training equipment and fluctuating PV power sources.
High-Humidity Environment Safety Risks: High year-round humidity in Nanning increases the risk of condensation leading to insulation faults.
Space Utilization Limitations: The limited space required compact equipment supporting future expansion.
KYN28-12 High-Voltage Switchgear
Key Technical Features: Aluminum-zinc coated steel plate construction; Mechanical interlocking; Cable chamber accommodates multiple single-core cables.
Addressed Pain Points: Corrosion resistance in high-humidity environments; Operational safety protection.
SWGCS Low-Voltage Switchgear
Key Technical Features: Modular withdrawable structure; Operating temperature range -15°C to +40°C; Rated current up to 6300A.
Addressed Pain Points: Compact layout; Flexible load expansion.
PV Grid-Connection Cabinet
Key Technical Features: Delixi-grade protection components; Customized PV bracket structure.
Addressed Pain Points: Safe integration of renewable energy sources.
Safe Operation Assurance: Successful operation without condensation alarms; High-voltage switchgear mechanical interlocking passed all verification tests.
Flexible Expansion Capability: SWGCS modular structure supports future capacity increases.
Efficient Delivery Outcome: Successful initial power-on.